Product Certification for Canada and Mexico

Canada and Mexico sit alongside the USA in North America but run their own approval systems. Canada needs ISED radio certification and accredited electrical-safety marks, while Mexico requires NOM certification and IFT homologation before goods clear customs.

How product regulation works in Canada & Mexico

Canada requires ISED certification for radio equipment and certification of mains-powered products by an SCC-accredited body such as CSA, UL or Intertek. Mexico requires certification to its mandatory NOM standards before customs clearance, with Spanish labelling, and IFT homologation for telecom and radio devices.

Canada & Mexico certifications we handle

← Compare with 80+ certifications worldwide in the Global Certification Hub

Canada vs Mexico at a glance

RequirementCanadaMexico
Electrical safetyCertification by an SCC-accredited body (e.g. CSA, cUL, cETL) to CSA standardsNOM certification, e.g. NOM-003-SCFI (electrical) and NOM-001-SCFI (electronic equipment)
Radio & telecomISED certification to RSS standards; ICES-003 for digital devicesTelecom equipment homologation (formerly IFT) to the applicable technical provisions
Energy efficiencyNRCan Energy Efficiency Regulations: verification mark and reportingNOM-ENER standards (CONUEE) for regulated appliances
Labelling languageEnglish and French (bilingual)Spanish, under NOM-024-SCFI and NOM-050-SCFI
Local partyCanadian representative required for ISED applicants outside CanadaMexican importer of record; certificates are linked to the importer

Canada: what Indian exporters need

Electrical safety: electrical products sold in Canada must be certified by a certification body accredited by the Standards Council of Canada (SCC) and carry its mark, such as CSA, cUL or cETL. Testing follows CSA standards, for example CSA C22.2 No. 62368-1 for audio/video and IT equipment.

Radio and EMC: devices with radio transmitters need ISED certification to the applicable Radio Standards Specification (for example RSS-247 for Wi-Fi and Bluetooth), plus listing in ISED’s Radio Equipment List. Digital devices without transmitters must comply with ICES-003. Applicants outside Canada must appoint a Canadian representative.

Energy efficiency: regulated products such as motors, lighting, air-conditioners and refrigerators must meet NRCan requirements and carry an energy-efficiency verification mark.

Mexico: what Indian exporters need

NOM certification: products covered by mandatory Mexican Official Standards (NOMs) must be certified by an accredited Mexican certification body, after testing in a laboratory accredited in Mexico. Electrical and electronic products commonly fall under NOM-003-SCFI or NOM-001-SCFI. Certificates are linked to the importer(s), so plan your importer structure before applying.

Telecom homologation: radio and telecom equipment, including Wi-Fi and Bluetooth devices, needs homologation from Mexico’s telecom regulator, based on tests to the applicable technical provisions. This role was held by the IFT and is moving to a new regulator under Mexico’s 2025 telecom reform, so PCN confirms the current authority and procedure before filing.

Labelling: Spanish-language commercial labelling is mandatory and is checked at customs.

Documents typically required

Canada & Mexico certification FAQs

Can I use my FCC or UL approval for Canada?

Not directly. ISED certification and SCC-accredited safety certification are separate, but much of the FCC and UL test data can be reused, which reduces time and cost.

How long does NOM certification take?

Typically 4–10 weeks, depending on testing in Mexico, the NOM involved and the number of models.

Does USMCA remove the need for certification?

No. USMCA affects tariffs and rules of origin, not product certification. Canadian and Mexican approvals are still required.

Do I need separate approvals for each country?

Yes. Canada and Mexico have separate regimes, but one coordinated test plan can cover both and avoid duplicate testing.

Exporting to Canada & Mexico?

Tell us the product and destination country – we will map every approval it needs within 24 hours.