If your product has a processor, a switching power supply or a radio, the US Federal Communications Commission regulates it. Radio devices need FCC Certification, which gives them a public FCC ID. Most other digital devices can use the lighter Supplier’s Declaration of Conformity (SDoC). PCN picks the right route, books the lab and files with the TCB, so you don’t lose weeks going back and forth.
| FCC Certification (FCC ID) | Required for intentional radiators: Wi-Fi, Bluetooth, Zigbee, LoRa, RFID and cellular. Test report reviewed by a Telecommunication Certification Body (TCB), and the grant is published on the FCC database. |
|---|---|
| Supplier’s Declaration of Conformity | Available for many unintentional radiators such as PCs, peripherals, power supplies and LED drivers. Testing is done by a competent lab, and a US-based responsible party keeps the records. |
| Rule parts we see most | Part 15B (digital devices), 15C (low-power transmitters), 15E (5 GHz Wi-Fi), and Parts 22/24/27 (cellular) |
| Validity | No expiry while the design stays the same; changes may need a permissive change |
On 29 October 2026 the FCC adopted rules (FCC 26-73) that limit recognition of test labs, TCBs and accreditation bodies to the United States and “Reciprocal Economies”: countries with a mutual recognition or comparable agreement with the US. India is not on that list.
PCN tracks the list and routes your testing to a lab the FCC will keep recognising, so your grant is not put at risk.
Send us your product details for a fixed quote covering testing, TCB and US agent fees.
It is the US Federal Communications Commission’s approval for electronic products that emit radio-frequency energy. Products need an FCC equipment authorization, either Certification (FCC ID) or SDoC, before they can be sold in or imported into the US.
Yes, for almost every electronic product with digital circuits or a radio. US importers and marketplaces such as Amazon routinely ask for the FCC ID or SDoC records before listing.
Not directly, because US limits and test methods differ. They do help us plan a shorter US test programme.
Usually you still need Part 15B testing of the finished product, and the host label must show “Contains FCC ID” with the module’s ID, following the module’s grant conditions.
No. It remains valid as long as the product isn’t modified in a way that affects compliance.
Typically 2–4 weeks for SDoC and 3–6 weeks for Certification, depending on lab slots and TCB queries.
Requirements, portals and fees change often. PCN confirms the applicable rules for each product before quoting. Certificates are issued by the relevant authority, accredited certification body or notified body.
Send your product name, HS code and destination. Our Delhi team will confirm the route, testing and timeline within 48 hours.
📞 +91 80109 05029 · ✉️ admin@pcnindiaglobal.com
Related: USA Certification · UL / ETL · EU RED · WPC-ETA (India) · TEC/MTCTE (India)
An independent compliance and certification consultancy helping international and domestic businesses with Indian regulatory approvals in electronics, IT, chemical and electrical sectors.