A Bluetooth speaker is a radio transmitter with a built-in lithium battery, so regulators treat it as radio equipment first and a battery product second. In the USA, the FCC, the Department of Energy, the CPSC and California's Prop 65 set the legal baseline, and retailers such as Amazon, Walmart and Best Buy usually add NRTL safety listing (UL or ETL) on top.
To import and sell Bluetooth speakers in the USA you will typically need:
Each row links to our detailed guide for that scheme. “Conditional” means it depends on the model’s features, packaging or sales channel – we confirm this in the free applicability check.
| Certification | Why it applies to Bluetooth speakers | Authority | Mark | Typical timeline | Local representative |
|---|---|---|---|---|---|
| FCC Equipment Authorization (Certification / SDoC) Mandatory |
A Bluetooth speaker is an intentional radiator and needs FCC Certification with an FCC ID. | Federal Communications Commission (FCC) / TCBs | FCC ID / FCC logo | 2–6 weeks | Yes – US agent / US responsible party |
| California Proposition 65 Compliance Conditional |
Needed if cables, rubber feet or housings expose users in California to listed chemicals above safe-harbour levels. | California OEHHA | Prop 65 warning label | 1–3 weeks | No |
Exact standards and editions depend on the model and the scheme; we confirm the test plan before any sample is shipped.
Yes. A Bluetooth speaker is an intentional radiator and needs FCC Certification with an FCC ID. Radio transmitters need FCC Certification through a TCB (FCC ID). Most other digital devices use Supplier's Declaration of Conformity (SDoC) with a US-based responsible party.
The core requirements are FCC. Depending on the exact model, Prop 65 may also apply. The table above explains why each one applies.
Often yes. FCC Certification needs a designated US agent for service of process, SDoC needs a US-based responsible party, and CPSC certificates are issued by the US importer. By scheme – FCC: Yes – US agent / US responsible party; Prop 65: No.
Typical timelines by scheme: FCC: 2–6 weeks; Prop 65: 1–3 weeks. Schemes can run in parallel once samples and documents are ready. Send us your model details for a realistic plan.
Usually. FCC accepts reports from FCC-recognised accredited labs worldwide, and NRTLs such as UL and Intertek can often build on existing IEC 62368-1 or CB reports with US national differences. Test to FCC rules from the start rather than converting European radio reports.
← Search all 80+ certifications in the Global Certification Hub · the USA certification services
Send us the model datasheet – we will confirm every approval it needs, the test plan, cost and timeline within 24 hours.