Power banks are portable lithium-ion battery packs with charging electronics, so they are treated as both a battery product and an electronic device. In India, BIS, the Department of Telecommunications, BEE and CPCB each regulate a different part of the product, and overseas manufacturers must apply through an Indian representative.
To import and sell power banks in India you will typically need:
Each row links to our detailed guide for that scheme. “Conditional” means it depends on the model’s features, packaging or sales channel – we confirm this in the free applicability check.
| Certification | Why it applies to power banks | Authority | Mark | Typical timeline | Local representative |
|---|---|---|---|---|---|
| BIS Compulsory Registration Scheme (CRS) Mandatory |
Power banks and the lithium-ion cells inside them must be registered under the Compulsory Registration Scheme. | Bureau of Indian Standards (BIS) | Standard Mark (R-number) | Varies – ask us | Yes for foreign manufacturers (AIR) |
| EPR Registration – Battery Waste Management Rules 2022 Mandatory |
Power banks are batteries placed on the Indian market and need Battery EPR registration. | Central Pollution Control Board (CPCB) | — | Varies – ask us | Yes – Indian producer/importer registers |
| Legal Metrology Packaged Commodities (LMPC) Registration Mandatory |
Imported power banks sold at retail are pre-packaged goods that need Legal Metrology declarations. | Legal Metrology Department (Dept. of Consumer Affairs / States) | — | Varies – ask us | Yes – Indian importer/packer registers |
Exact standards and editions depend on the model and the scheme; we confirm the test plan before any sample is shipped.
Yes. Power banks are on the CRS list under IS 13252 (Part 1).
Yes. Lithium cells and batteries need their own CRS registration to IS 16046 (Part 2), usually held by the cell manufacturer.
The Battery Waste Management Rules, 2022 – producers and importers must register with CPCB and meet collection and recycling obligations.
Yes. The declared capacity and ratings on the label must match the tested product.
Typically four to six weeks, provided the cells are already registered.
← Search all 80+ certifications in the Global Certification Hub
Power banks in India depend on two BIS registrations – the product and its cells – plus battery EPR. We check the cell registration first, because it is the most common cause of delay.
Send us the model datasheet – we will confirm every approval it needs, the test plan, cost and timeline within 24 hours.